Official Lenovo service manual for MetroCluster hardware maintenance with ONTAP 9, covering FC and IP configurations.
This service guide provides step-by-step procedures for maintaining MetroCluster hardware components in ONTAP 9 environments. It covers maintenance tasks such as FC-to-SAS bridge replacement, FC and IP switch upgrades, hot-add and hot-remove storage, and failure recovery scenarios. The guide is designed for technicians managing FC and IP-based MetroCluster configurations, with detailed instructions for replacing hardware, updating firmware, and verifying connectivity.
The document includes chapters on failure scenarios, cabling, port assignments, and reconfiguring switch layouts. It also references other Lenovo documentation for software upgrades and standard shelf maintenance procedures. Copyrighted by Lenovo in 2019 and 2023, it is intended for use with ONTAP 9 systems and includes support contact information for troubleshooting. This manual is written in Chinese.
This guide describes how to perform maintenance on the MetroCluster hardware components. You should use this guide for maintaining the MetroCluster-specific hardware components in your MetroCluster configuration.
You can hot-replace a failed power supply module. The procedure is detailed in Chapter 4, page 42.
RAID SyncMirror of the node stops syncing. HA capability is impacted and the cluster goes out of quorum. Replace the failed switch as necessary.
You can find other MetroCluster documentation in the ONTAP 9 Documentation Center. Additional procedures are referenced in the MetroCluster Transition, Upgrade, and Expansion Guide.