Pre-installation manual for the Instron 34TM-50 dual column benchtop testing system covering safety, site requirements, specifications, and lifting.
This pre-installation manual (document M10-17322-CS, Revision J) is for the Instron 34TM-50, a dual column benchtop materials testing system. It opens with a system description and terminology, the system components, operating principle, hardware controls and software, and the safety and information labels applied to the system.
Further chapters set out the responsibilities of the customer and the supplier, the site requirements (frame location, workbench, floor load, power supply, telephone and network access, top clearance, and environmental conditions), and the dimensions, weight, and performance specifications of the 34TM-50. The manual closes with guidance on residual risks and safe use and with lifting and handling procedures covering unpacking, moving the frame by beam, shipping skid, or crane, leveling the frame, and bolting it to the workbench. This manual is written in Chinese.
Press it whenever you believe a situation is unsafe. The emergency stop cuts the hydraulic power or electric drive from the test system as quickly as possible.
Protective clothing such as gloves must be worn when the working temperature exceeds 60 °C (140 °F) or is below 0 °C (32 °F).
Insert the specimen to at least the depth recommended in the grip documentation; the depth can vary between 66% and 100% insertion depth.
Product support for Instron systems is available at www.instron.com.