Hytork Twin Port Actuators (0-90°) & QA Series installation, operating and maintenance instructions covering safety, repair kits, disassembly, assembly…
This is Hytork's Installation, Operating and Maintenance Instructions for Twin Port Actuators (0-90°) and the QA Series, document MAC129916. It starts with important safety procedures: disconnect air and electrical supplies before maintenance, isolate piping and relieve trapped media pressure before removing a valve, contain spring tension with Hytork Retractor Rods on spring return actuators, and never blow pistons out with air pressure when end caps are removed.
The document lists the contents of Hytork actuator repair kits, gives complete disassembly and assembly instructions for double acting and spring return models, refers to Fig. 5 for piping, and describes testing with compressed air at 80-100 psi (5.5 - 7 bar). It also covers cycling and testing actuators that have been stored or not operated for at least a 3 month period, and gives Hytork service contact details in the USA, Australia and the UK.
| Rotation range | 0–90° |
|---|---|
| Overtravel | 1.5 degrees at either end of the stroke |
| Travel stop adjustment | 10 degrees including overtravel |
| Test air pressure | 80-100 psi (5.5 - 7 bar) |
| Retractor rod thread engagement | at least 1/2 in (12 mm) |
Disconnect the air and electrical supplies first; if a valve is being removed, isolate the piping system and relieve trapped media pressure.
It is contained with Hytork Retractor Rods, as shown in the spring return end cap assembly figure.
Use compressed air at 80-100 psi (5.5 - 7 bar) and check the seal areas with soapy water for leaks.
Actuators not operated for at least a 3 month period should be cycled a minimum of ten times.