This guide details the installation process for Haofeiyuhong fiber cement wood grain panels, covering preparation, framing, fixing, and finishing steps.
This document serves as an installation guide for Haofeiyuhong fiber cement wood grain panels. It outlines the necessary preparations before construction, including tool requirements and proper storage of the panels. The guide emphasizes reading the instructions carefully and ensuring the wall surface is flat and free of obstacles before beginning. This manual is written in Chinese.
Tools include a level, cutting machine, hammer, drill, and stainless steel or galvanized self-tapping screws.
The studs should be installed at 50 cm intervals.
Each panel should overlap the previous one by 2-3 cm.
A flexible polyurethane (PU25) or tile adhesive should be used to fill the 3 mm gap.