Haofeiyuhong Fiber Cement Wood Grain Panel Installation Guide

This guide details the installation process for Haofeiyuhong fiber cement wood grain panels, covering preparation, framing, fixing, and finishing steps.


Haofeiyuhong Fiber Cement Wood Grain Panel Installation Guide - cover page
Brand
Haofeiyuhong
Category
Other
Document type
Installation Guide
Language
Chinese
Pages
2
File format
PDF
File size
177 KB
Published
03 November, 2026
Updated
03 November, 2026
MD5 checksum
126977A1C0770634E1FBA20F55120093

About this manual

This document serves as an installation guide for Haofeiyuhong fiber cement wood grain panels. It outlines the necessary preparations before construction, including tool requirements and proper storage of the panels. The guide emphasizes reading the instructions carefully and ensuring the wall surface is flat and free of obstacles before beginning. This manual is written in Chinese.

What's inside

  • Construction Preparation
  • Tool Preparation
  • Wall Inspection
  • Ridge Installation
  • Panel Fixing
  • Seam Treatment
  • Door and Window Installation
  • Cleaning and Painting

Frequently asked questions

What tools are required for installing the fiber cement wood grain panels?

Tools include a level, cutting machine, hammer, drill, and stainless steel or galvanized self-tapping screws.

What is the recommended spacing for installing the steel or wooden studs?

The studs should be installed at 50 cm intervals.

How should the panels be overlapped when installing them vertically?

Each panel should overlap the previous one by 2-3 cm.

What adhesive should be used to seal gaps between horizontally joined panels?

A flexible polyurethane (PU25) or tile adhesive should be used to fill the 3 mm gap.

Download PDF (177 KB)