GPT 7.6.5 Isolation Gasket Installation Instructions

Installation instructions for GPT 7.6.5 isolation gaskets, including flange preparation, torque sequence, and recommended bolt torque values.


GPT 7.6.5 Isolation Gasket Installation Instructions - cover page
Brand
GPT
Category
Industrial Supply
Document type
Installation Guide
Language
English
Pages
2
File format
PDF
File size
165 KB
Published
23 November, 2026
Updated
23 November, 2026
MD5 checksum
0379B344456FCF22A3F4C9A413B921FB

About this manual

This document provides installation instructions for GPT 7.6.5 isolation gaskets. It covers flange face inspection, surface finish requirements, gasket and washer installation, and a legacy star-pattern torque sequence.

It also includes a recommended bolt torque table by NPS and pressure class, plus notes on lubrication, bolt stress, and isolation testing.

What's inside

  • Installation Instructions
  • Flange Face Inspection
  • Surface Finish
  • Torque Sequence
  • Recommended Bolt Torque Values
  • Torque Table for GPT Isolating Gaskets
  • Isolation Testing
  • Notes

Specifications

Surface finish3.2 - 6.3 R (120 - 250 RA)
Flange gap1/8 in (3 mm) larger than gasket thickness
Coefficient of friction0.11
Recommended bolt stress30,000 psi
Maximum bolt stress50,000 psi

Frequently asked questions

Can impact drivers or hammer wrenches be used?

No; use a torque wrench or appropriate tensioning equipment.

Should bolts, washers, sleeves, or gaskets be reused?

No; always use new bolts and never reuse washers, sleeves, or gaskets once installed.

When should isolation testing be performed?

Isolation testing should be completed before hydro testing.

What lubricant is recommended?

Apply PIKO-LUBE; do not use metallic based lubricants.

Download PDF (165 KB)

More GPT Manuals


View all GPT manuals →