This guide provides instructions for installing and operating Gore PEV-133 thermal film, covering surface preparation, product removal from the liner…
This document is an installation and operation guide for the GORE® PEV-133 thermal film. It outlines best practices established by W. L. Gore & Associates to ensure optimal performance of the product throughout its lifecycle. The guide details steps for surface preparation, separating the film from the release liner using specific tools like blunt-tipped tweezers or a pull tab, and applying the adhesive-backed film. This manual is written in Chinese.
Unused thermal film should be stored in its original packaging for a maximum of one year.
The product should be stored at approximately 21°C (70°F) with relative humidity around 50%.
You must press the entire edge and middle of the product with a light finger pressure of 5-20 psi.