Fleetwood V083122 Arche-Duct System Maintenance Instructions

Provides pre‑installation, post‑installation care, cleaning procedures and corrosion prevention for the Fleetwood V083122 Arche‑Duct System.


Fleetwood V083122 Arche-Duct System Maintenance Instructions - cover page
Brand
Fleetwood
Category
Other
Document type
User Manual
Language
English
Pages
6
File format
PDF
File size
211 KB
Published
03 October, 2026
Updated
03 October, 2026
MD5 checksum
5A48CD951349C217D8727D0ACD1CCC05

About this manual

The manual outlines steps to prepare the Arche‑Duct System before installation, protect it during construction, and maintain it after installation. It includes guidance on drainage cleaning, coating protection, glass film removal, and recommended protective measures.

Detailed cleaning schedules are given, ranging from monthly to every five years, with special recommendations for salty or chemically aggressive environments. The document also covers corrosion types, appropriate cleaning agents, and safety precautions for glass and metal surfaces.

What's inside

  • Before Installation
  • During Construction
  • Post Installation
  • Cleaning Frequency
  • Procedure #1 – Monthly
  • Procedure #2 – Every 3 Months
  • Procedure #3 – Every 6 Months
  • Procedure #4 – Every 5 Years
  • Corrosion Types
  • Glass & Frame Protection

Specifications

CoatingAkzo Nobel 10-7011 Epoxy Powder Paint
Glass film removal temperature32 °F to 140 °F

Frequently asked questions

Can the coating be exposed to sunlight for more than three months?

No, the coating must not be exposed to ultraviolet light or the sun’s rays for more than three months.

What type of coating is used on the Arche‑Duct System?

The system is coated with Akzo Nobel 10‑7011 Epoxy Powder Paint.

Download PDF (211 KB)