Installation guide for Fisher & Paykel gas cooktops CG244D, CG305D, and CG365D, covering safety, electrical, and gas connection requirements.
This guide provides step-by-step instructions for installing Fisher & Paykel gas cooktops CG244D, CG305D, and CG365D. It includes safety warnings, electrical and gas connection requirements, clearance dimensions, and part specifications. Installation must comply with local codes and NFPA standards. Only authorized personnel should install the unit, and genuine replacement parts must be used.
The guide also details product dimensions, cutout requirements, and clearance distances for countertops and overhead cabinets. It specifies materials for non-combustible surfaces and includes information on high-altitude installations and required conversion kits for models CG305D, CG365D, and CG244D. This manual is written in Chinese.
| Gas Inlet Connection Location | Rear right corner |
|---|---|
| Maximum Inlet Gas Supply Pressure | 20” W.C. (5 kPa) |
| Minimum Gas Supply Pressure for Regulator Testing | 5” W.C. Natural Gas / 12” W.C. LP gas |
| Power Outlet Requirement | 110-120V 60Hz, grounded, within 35 1/2” (900 mm) of appliance |
It must be installed by an authorized person, such as a licensed plumber or gas fitter, especially in Massachusetts.
1/4” (6 mm) flame retardant millboard covered with not less than No. 28 MSG sheet steel, 1/32” (0.4 mm) stainless steel, 1/32” (0.6 mm) aluminum or 1/32” (0.5 mm) copper.
It requires a 110-120V 60Hz, grounded power outlet within 35 1/2” (900 mm) of the appliance’s rear center.