Installation instructions for the Fairborn USA Series 2000 rigid dock shelter, including pre-installation checks, mounting steps, and safety warnings.
This document provides installation instructions for the Fairborn USA Series 2000 rigid dock shelter, covering all models. It includes pre-installation checks for door dimensions, shelter projection, carrier heights, and frame elevation.
The guide details mounting steel guards, fastening curtains and frame members, securing side and head members, attaching tension cords and wind straps, installing foam bottom pads, and caulking voids, with safety warnings for lifting and attachment.
| Shelter frame projection beyond dock bumper | 14"-18" |
|---|---|
| Shelter top height off grade | 15' 0" |
| Side curtain inside edge height | 7' 0" I.D. |
| Minimum lifting device capacity | 500 lbs |
| Minimum bumper protection for dock seals | 4" minimum |
It is recommended that the shelter frame project 14"-18" beyond the dock bumper.
A lifting device capable of lifting at least 500 lbs. at the installation angle is required.
Products are warranted free from original defects for one year from date of shipment.
Dock seals must have adequate bumper protection of 4 inches minimum.