EZH20 In Wall Bottle Filling Station EZWSMD*1A EZWSM8*1A EZWSM8*2A LZWSMD*1A LZWSM8*1A LZWSM8*2A Installation and Use Ma

The EZH20 In Wall Bottle Filling Station manual provides installation steps, filter setup, control board programming, and operation instructions for all…


EZH20 In Wall Bottle Filling Station EZWSMD*1A EZWSM8*1A EZWSM8*2A LZWSMD*1A LZWSM8*1A LZWSM8*2A Installation and Use Ma - cover page
Brand
EZH20
Category
Other
Document type
User Manual
Language
English
Pages
9
File format
PDF
File size
657 KB
Published
07 October, 2026
Updated
07 October, 2026
MD5 checksum
831B92C9E734D8B267EF260B02FF75F7

About this manual

This manual covers the complete installation of the EZH20 In Wall Bottle Filling Station, including mounting the frame, connecting water supply, and installing optional filters. Detailed wiring diagrams and plumbing instructions ensure compliance with local codes and proper grounding to avoid water contamination.

Operational guidance includes programming the control board, resetting the filter monitor, adjusting the IR sensor range, and setting unit type (refrigerated or non‑refrigerated). The document also explains how to verify software versions, reset the bottle count, and perform routine maintenance.

What's inside

  • Rough‑In
  • Installation Instructions
  • Filter Installation
  • Control Board Programming
  • Reset Filter Monitor
  • Setting IR Sensor Range
  • Setting Unit Type
  • Reset Bottle Count
  • Verifying Control Board Software

Specifications

Maximum inlet water temperature100°F (38°C)
Maximum supply pressure100 psi
Bottle size simulated per count20 oz
Download PDF (657 KB)