The EZH20 In Wall Bottle Filling Station manual provides installation steps, filter setup, control board programming, and operation instructions for all…
This manual covers the complete installation of the EZH20 In Wall Bottle Filling Station, including mounting the frame, connecting water supply, and installing optional filters. Detailed wiring diagrams and plumbing instructions ensure compliance with local codes and proper grounding to avoid water contamination.
Operational guidance includes programming the control board, resetting the filter monitor, adjusting the IR sensor range, and setting unit type (refrigerated or non‑refrigerated). The document also explains how to verify software versions, reset the bottle count, and perform routine maintenance.
| Maximum inlet water temperature | 100°F (38°C) |
|---|---|
| Maximum supply pressure | 100 psi |
| Bottle size simulated per count | 20 oz |