Detailed installation guide for Evolve Stone 2020.5 decorative stone siding, covering nail-on and glue-up methods with safety and tool requirements.
This guide provides step-by-step instructions for installing Evolve Stone 2020.5, including standard nail-on and alternate glue-up methods over wood or cement substrates. It covers tools, safety, nailing patterns, corner installations, and specific details for different wall types. Safety precautions and material requirements are emphasized throughout.
The guide is designed for professional installers and includes diagrams and notes for proper installation, such as drainage mat placement, WRB system requirements, and stone nailing patterns based on size. This manual is written in Chinese.
16-gauge stainless steel Finish Nails at 2 ½" length or long enough to penetrate through the structural substrate.
An 1/8” fabric faced drainage mat is required.
A fully installed water and airtight WRB system must be installed prior to the install of the drainage mat and pin nailed stone.