Evapco PMC-E CHJV 125D High Velocity Evaporative Condenser Installation Manual

Installation manual for the Evapco PMC-E CHJV 125D high velocity evaporative condenser, covering lifting, assembly, and structural support.


Evapco PMC-E CHJV 125D High Velocity Evaporative Condenser Installation Manual - cover page
Brand
EVAPCO
Document type
Installation Guide
Language
Chinese
Pages
16
File format
PDF
File size
1.4 MB
Published
15 October, 2026
Updated
15 October, 2026
MD5 checksum
A73A3490645C7533DB3F7CBF34CAF50C

About this manual

This document is an installation guide for the Evapco PMC-E series high velocity evaporative condensers. It provides detailed instructions on transportation, storage precautions, general safety rules, and compliance with international building codes (IBC). The manual outlines specific requirements for steel structure supports to ensure proper load distribution during operation. This manual is written in Chinese.

What's inside

  • Transportation
  • Storage
  • General Rules
  • International Building Codes
  • Steel Structure Support
  • Lifting the Water Pan/Fan Section
  • Long Distance Lifting
  • Applying Sealant Tape
  • Lifting the Coil Section
  • Assembling the Unit

Specifications

Maximum beam deflection limit1/360 of length and not exceeding 1/2" (13mm)
Maximum beam tilt limitLess than 1.5mm per meter

Frequently asked questions

What is the maximum allowable bending for the steel beams supporting this unit?

The beam's curvature must not exceed one-third of its length or 13mm.

How many lifting points are required on the water pan/fan section for units longer than 6 meters?

Units with a length greater than 6m require either 6 or 8 lifting points.

What is the minimum height H required to lift the water pan/fan section for a PMC-175E model?

The minimum height H for lifting this unit's water pan/fan section is 3.6 meters.

Download PDF (1.4 MB)