Elpro-Energo N1-EN Hermetically Sealed Distribution Transformer Operation Manual

Elpro-Energo operation manual for hermetically sealed oil distribution transformers: transport, storage, installation, commissioning, maintenance and repair.


Elpro-Energo N1-EN Hermetically Sealed Distribution Transformer Operation Manual - cover page
Brand
Elpro-Energo
Category
transformers
Document type
User Manual
Language
English
Pages
6
File format
PDF
File size
419 KB
Published
16 November, 2026
Updated
16 November, 2026
MD5 checksum
55BD0EC6D2D45209A8147885530BCE0E

About this manual

This operation manual (Dok. No. N1-EN, dated 07.07.2022) from Elpro – Energo Transformers covers transport, storage, installation, commissioning and maintenance of hermetically sealed distribution transformers. It explains that the sealed ribbed tank absorbs the volume changes of the oil, so the standard design has no conservator and no oil-level indicator, and the oil is filled at the production site so that no overpressure or under-pressure is produced.

The manual gives transport strapping and acceleration limits, storage conditions, tightening torques for MV and LV bushing connections, the steps for changing the tap, settings for monitoring and protective devices such as R.I.S. / DGPT2 / DMCR 3.0 and the two-contact thermometer, service intervals, and procedures for oil draining, filling and testing according to IEC 60296. It ends with the scope of delivery and the optional accessories.

What's inside

  • General Guidelines
  • Transport
  • Storage
  • Installation and Commissioning
  • Change of tap
  • Maintenance Work
  • Repair Work
  • Oil Draining
  • Oil Filling
  • Oil Testing

Specifications

Minimum storage temperature-25 °C
Maximum installation height1,000 m above sea level
Maximum ambient operating temperature+40 °C
Number of transport straps per transformerat least 4
Tightening torque, bolt M 1215.5 Nm
Tightening torque, bolt M 2052.0 Nm
Tightening torque, connection flag screw M 16110.0 Nm
Protective device R.I.S. / DGPT2 / DMCR 3.0, trip temperature T1100 °C
Protective device R.I.S. / DGPT2 / DMCR 3.0, alarm temperature T280 °C
Protective device pressure setting P0.2 Bar
Minimum oil breakdown valuesNew oil 50 kV; operating oil 30 kV
Wheels included in delivery4 pcs

Frequently asked questions

How often does the transformer need maintenance?

Once a year the tank, bushings, drain valve and connection flag screws are checked for oil leakage and tightness; every five years the earthing connection and electrical measurements are carried out together with the revision of the transformer station.

What is the lowest permitted storage temperature?

The storage temperature must not fall below -25 °C.

Can the tap be changed while the transformer is connected to the grid?

No. The tap can be changed only when the transformer is not connected to the grid, and the required tap is set according to the rating plate.

When must the oil be replaced?

Replacement is required when the oil breakdown values are lower than 30 kV, with sampling and testing done according to IEC 60296.