This manual provides installation, operation, and maintenance instructions for ECR International AT Series electric hot water boilers, including safety…
This document is the Installation, Operation & Maintenance Manual for the ECR International AT Series Electric Hot Water Boilers. It covers safety symbols, product descriptions, voltage rating tables, and detailed installation procedures for both 2-element and 4-element configurations. The manual emphasizes that installation must be performed by a qualified expert in accordance with local codes and standards such as the National Electrical Code and ASME Boiler & Pressure Vessel Code.
| Boiler Material | Cast iron |
|---|---|
| Safety Standard | ASME Boiler & Pressure Vessel Code |
| Control System | Electronic control board |
| Circulating Pump Rating | 120Vac up to 5A |
Installation should be done only by a qualified expert in accordance with appropriate installation manuals and local codes.
The manual suggests a height of 5 feet 3 inches for ease of installation.
You must allow at least 12 inches minimum from the front of the unit to a door or wall.
The unit must be installed with a minimum clearance of 16 inches from the top to the ceiling.