Installation guide for durlum's S5.4 K-BR RHOMBOS ceiling lighting ambience system, covering structural prerequisites, mounting sequence, and compliance…
This guide provides step-by-step instructions for installing the durlum S5.4 K-BR RHOMBOS ceiling lighting ambience system. It covers structural prerequisites, mounting sequence, storage, and compliance with EN 13964:2007. The system is designed for professional dry construction companies and requires proper suspension points and load-bearing capacity checks. Panels must be stored between 10°C and 40°C and protected from UV exposure.
Installation involves creating a layout plan, determining suspension points, mounting dowels, and assembling panels using cross grids and connecting elements. Panels can be connected with or without joint tape, and perimeter trim is mounted with F-brackets. Load-bearing components must be suspended separately. The guide emphasizes safety, precision, and adherence to building codes.
| Load Capacity | 40 N/m² surface load |
|---|---|
| Storage Temperature | Between 10°C and 40°C |
| Certification | ISO 9001, ISO 14001, ISO 50001 |
The ceiling is dimensioned to carry its own weight plus a surface load of 40 N/m².
Panels must be stored between 10°C and 40°C.
The system complies with EN 13964:2007 and is CE-certified.