Daikin DBG packaged gas/electric unit installation instructions for 7.5-12.5 ton belt drive light commercial models.
This document provides installation instructions for Daikin DBG packaged gas/electric units, covering 7.5-12.5 ton belt drive light commercial models. It addresses outdoor installation of single package heating and cooling units and includes safety information for installers.
The manual covers clearances, roof curb and duct connections, rigging, electrical wiring, gas supply piping, circulating air and filters, venting, condensate drain, startup checks, belt drive motor sheave adjustments, gas system checks, maintenance, and troubleshooting.
| Capacity | 7.5-12.5 Ton |
|---|---|
| Drive Type | Belt Drive |
| Model Series | DBG |
| Unit Type | Packaged Gas/Electric Unit |
Only trained or licensed personnel should perform installation and service.
Do not light appliances or touch electrical switches; call your gas supplier from a neighbor's phone.
No, it must not be used as a construction heater during the finishing phases of construction.