Daikin DBG Packaged Gas/Electric Unit Installation Instructions

Daikin DBG packaged gas/electric unit installation instructions for 7.5-12.5 ton belt drive light commercial models.


Daikin DBG Packaged Gas/Electric Unit Installation Instructions - cover page
Brand
Daikin
Category
Air conditioner
Document type
Installation Guide
Language
English
Pages
48
File format
PDF
File size
4.1 MB
Published
17 November, 2026
Updated
17 November, 2026
MD5 checksum
9F307B34E7594546AC8979F020E44A64

About this manual

This document provides installation instructions for Daikin DBG packaged gas/electric units, covering 7.5-12.5 ton belt drive light commercial models. It addresses outdoor installation of single package heating and cooling units and includes safety information for installers.

The manual covers clearances, roof curb and duct connections, rigging, electrical wiring, gas supply piping, circulating air and filters, venting, condensate drain, startup checks, belt drive motor sheave adjustments, gas system checks, maintenance, and troubleshooting.

What's inside

  • Safety Instructions
  • Clearances
  • Electrical wiring
  • gas supply piping
  • Circulating Air and Filters
  • Venting
  • Startup, Adjustments, and Checks
  • Maintenance
  • Troubleshooting
  • Wiring Diagram

Specifications

Capacity7.5-12.5 Ton
Drive TypeBelt Drive
Model SeriesDBG
Unit TypePackaged Gas/Electric Unit

Frequently asked questions

Who is qualified to install or service this unit?

Only trained or licensed personnel should perform installation and service.

What should you do if you smell gas?

Do not light appliances or touch electrical switches; call your gas supplier from a neighbor's phone.

Can the unit be used as a construction heater?

No, it must not be used as a construction heater during the finishing phases of construction.

Download PDF (4.1 MB)

More Daikin Manuals


View all Daikin manuals →