Bryant G8C/FG8 Series Automatic Ignition Furnace Installation Manual

Installation manual for Bryant G8C/FG8 Series automatic ignition furnaces, covering positioning, conversion, venting, gas piping, wiring and installation…


Bryant G8C/FG8 Series Automatic Ignition Furnace Installation Manual - cover page
Brand
Bryant
Category
Heater
Document type
Installation Guide
Language
English
Pages
28
File format
PDF
File size
878 KB
Published
10 November, 2026
Updated
10 November, 2026
MD5 checksum
11EAF1EB701E46E43AC200C98DD081D2

About this manual

The Bryant G8C/FG8 Series installation manual covers all-position automatic ignition furnaces in 50-125 MBH input models and upflow/horizontal automatic ignition furnaces in 150 MBH input models. It begins with general information, furnace specifications, pre-installation inspection and code compliance, then gives installation positions and conversion steps for 50-125 MBH models.

Later sections cover furnace location, combustion and ventilation air, sizing and duct design, return air and filters, gas piping, Category I venting, electrical wiring, blower and filter performance, blower timings, diagnostics, the wiring diagram, pre-operational checks, sequence of operation, furnace operation, installation checks, service instructions and replacement parts. The manual states that 150 MBH models are not approved for downflow application and that 50-125 MBH models may be converted between upflow and downflow by exchanging casing caps and rotating the vent blower 180 degrees.

What's inside

  • General Information
  • Furnace Specifications
  • Pre-Installation Inspection
  • Code Compliance
  • Installation Position (50-125 MBH Models)
  • Conversion Information (50-125 MBH Models)
  • Furnace Location
  • Gas Piping
  • Venting (Category I)
  • Electrical Wiring

Specifications

SeriesG8C / FG8 Series automatic ignition furnaces
150 MBH model configurationUpflow / horizontal automatic ignition furnace
Vent connection3 in. supplied on all models; installer-supplied transition to 4 in. or 5 in. where necessary
U.S. certificationDesign certified to American National Standard Z21.47
Downflow application (150 MBH models)Not approved

Frequently asked questions

Can the 150 MBH model be installed in a downflow position?

No. The manual states that this furnace is not approved for downflow application; it may be installed in an upflow or horizontal position.

What vent connection size do all models have?

All models are supplied with 3-inch vent connections; an installer-supplied transition to 4 or 5 inches is used where necessary.

What must be removed from the blower motor before the furnace is first operated?

The shipping strap on the blower motor shaft must be removed before the furnace is operated for the first time.

Can 50-125 MBH models be converted between upflow and downflow?

Yes. The manual gives conversion steps that include exchanging the top and bottom casing caps and rotating the vent blower 180 degrees.

Download PDF (878 KB)

More Bryant Manuals


View all Bryant manuals →