Installation and servicing instructions for the Baxi Powermax 140/155x open vent and sealed system gas boilers.
This document gives installation and servicing instructions for the Baxi Powermax 140 and 155x boilers, including the open vent models OV 140 P, OV 155 xP, OV 140 CP and OV 155 xCP and the sealed system models SS 140 P, SS 155 xP, SS 140 CP and SS 155 xCP. It covers safety regulations, description, gas and electric supply, siting, flueing options, ventilation requirements, technical data and installation.
The document also covers electrical connection and wiring diagrams, water supply/primary system, commissioning, servicing, fault finding, functional flow diagrams, a short list of spare parts, extended balanced flue installation and an optional immersion heater. The text states that the appliance is for use with natural gas only and must be installed by a competent person in accordance with the Gas Safety Regulations.
| Gas type | Natural gas only |
|---|---|
| Gas supply rate | 1.6 to 2.0 cubic metres per hour |
| Gas connection | Rp 1/2 (1/2 in B.S.P.) |
| Electrical supply | 230V ~ 50Hz single phase 3A fused |
| Power consumption | Approximately 140W |
| Flue length | Up to 9.0 metres |
| Thermal store temperature | About 80°C |
The appliance is for use with natural gas only.
It requires a 230V ~ 50Hz single phase 3A fused electrical supply.
It must be installed by a competent person in accordance with the Gas Safety Regulations.
The twin pipe flue system is designed for a length of up to 9.0 metres including a balanced flue terminal.