This manual provides installation and maintenance instructions for the AVANTI Octopus L80 work platform used on wind turbines.
This document is the official installation and maintenance manual for the AVANTI Octopus L80 work platform, designed for integration with wind turbines. It covers essential safety requirements, installation procedures including electrical connections and mechanical assembly, and maintenance schedules. The manual emphasizes that only trained and certified personnel should perform installation and maintenance tasks to ensure safety and warranty validity. This manual is written in Chinese.
| Maximum total travel height | 120 meters |
|---|---|
| Design service life | 20 years |
| Annual operating hours | 12.5 hours |
| Voltage (50 Hz) | 400 V ± 5 % |
| Fuse rating | 16 A |
| Platform fence height | 1.1 m |
| Minimum gap around work platform | 60 mm |
Installation and maintenance must be performed by certified technicians.
AVANTI guarantees the product for 365 days from the date of shipment.
The platform must not be used in bad weather, including wind speeds exceeding 18 meters per second.
No, the work platform can only be used when the turbine is not generating electricity.