This manual provides installation, commissioning, maintenance, and troubleshooting instructions for the Aumuller SP8 S2 axial window opener available in 24V…
The document serves as an installation and commissioning guide for the Aumuller SP8 S2 axial window opener. It covers safety regulations, expected usage scenarios such as natural smoke extraction (SHEV), and specific technical parameters for both 24V DC and 230V AC models.
Detailed step-by-step instructions are provided for installation, including pre-installation checks, mounting brackets, drilling requirements, electrical connections, and final safety testing. The guide also addresses hazard analysis regarding pinch points, cable routing, and compliance with mechanical directives. This manual is written in Chinese.
The manual is suitable for trained personnel and operators of natural smoke extraction ventilation systems (NRA/SHEV).
If the opening edge width exceeds 200 mm, a risk assessment must be conducted according to mechanical directives.
The closing force must not exceed 150 N to ensure safety compliance.