Installation and service manual for Attack DP25, DP35, DP45, DP75, and DP95 Profi gasification boilers, covering system design, commissioning, operation…
This manual provides comprehensive guidance for the installation, commissioning, operation, and servicing of the Attack DP25, DP35, DP45, DP75, and DP95 Profi gasification boilers. It details the technical principles of gasification, recommended system designs including buffer tanks and flue configurations, and specific installation instructions for electrical and hydronic connections. The document also covers boiler operation modes, cleaning procedures, and troubleshooting common issues.
| Heat output (DP25) | 10 - 25 kW |
|---|---|
| Fuel chamber capacity (DP25) | 96 litres |
| Maximum operating pressure | 3 bar |
| Thermal efficiency | 85% - 86% |
| Maximum noise level | 65 dB |
| Electrical supply | 230 VAC 50Hz |
The recommended fuel is dry wood with a calorific value of 15 - 17 MJ/kg, a water content between 12% and 20%, and a diameter of 80 – 150mm.
The pump comes on when the boiler temperature reaches 65ºC and goes off if the temperature falls below 60ºC.
The maximum length of logs varies by model, ranging from 550mm for the DP25 to 1000mm for the DP75 and DP95.