American Fiber Cement Two-Layer Steel Attachment System Installation Guide

Installation guide with typical details for the American Fiber Cement Two-Layer Steel Attachment System using rivets.


American Fiber Cement Two-Layer Steel Attachment System Installation Guide - cover page
Brand
American Fiber Cement Corporation
Category
Other
Document type
Installation Guide
Language
English
Pages
33
File format
PDF
File size
5.1 MB
Published
01 October, 2026
Updated
01 October, 2026
MD5 checksum
47269F1B1C669A4BE62B14EAB2580339

About this manual

This guide provides typical detail drawings for installing architectural panels with the Two-Layer Steel Attachment System. It covers top and bottom panel terminations, horizontal and vertical joints, expansion joints, panel breaks at penetrations, and corner details.

All pages note that panel vertical and horizontal joint spacing should be 3/8" typical, and include a fastener layout reference of 3" = 1'-0". The document is intended for contractors and installers who need precise layout information for this attachment system.

What's inside

  • Top Panel @ Coping
  • Top Panel @ Soffit
  • Horizontal Joint @ Continuous Substrate
  • Horizontal Joint @ Break In Substrate
  • Not Permitted @ Break in Substrate
  • Horizontal Joint @ Expansion Joint
  • Horizontal Panel Break @ Penetration
  • Bottom of Panel @ Wall Base
  • Vertical Panel Joint Options
  • Panels @ Outside Corner

Specifications

Panel joint spacing3/8" typical
Fastener layout dimension3" = 1'-0"

Frequently asked questions

What is the recommended panel joint spacing?

The recommended panel vertical and horizontal joint spacing is 3/8" typical.

Are breaks in substrate permitted for this attachment system?

No, breaks in substrate are not permitted.

What is the typical fastener layout dimension?

The typical fastener layout is 3" equal to 1'-0".

Download PDF (5.1 MB)