IBM SAN48C-6 MTM 8977-T48 32 Gbps 48-Port Fibre Channel Switch Installation, Service, and User Guide

IBM Storage Networking MTM 8977-T48 IBM SAN48C-6 32 Gbps 48-Port Fibre Channel Switch Installation, Service, and User Guide SC27-9572-00


IBM SAN48C-6 MTM 8977-T48 32 Gbps 48-Port Fibre Channel Switch Installation, Service, and User Guide - cover page
Brand
IBM
Category
Network Switches
Document type
User Manual
Language
English
Pages
89
File format
PDF
File size
3.6 MB
Published
01 December, 2023
Updated
01 December, 2023
MD5 checksum
96B77319EEA4CD26BE0FB42F9AA222CB

About this manual

This IBM Storage Networking publication (SC27-9572-00) is the Installation, Service, and User Guide for the IBM SAN48C-6 32 Gbps 48-Port Fibre Channel Switch, machine type/model 8977-T48. It describes the switch, its fan modules, power supplies, LEDs and transceivers, and sets out cabinet and rack requirements before installation.

The guide then walks through unpacking and inspecting the switch, installing it in a 4-post or 2-post rack, grounding it, installing and removing power supply units and fan modules, connecting the console port, management ports and Fibre Channel ports, and handling SFP transceivers and fiber-optic cables. Powering up the switch, technical specifications, cable and port specifications, power cords and plugs, a site planning checklist and maintenance records, and regulatory notices round out the document.

What's inside

  • Switch Overview
  • Fan Modules
  • Power Supplies
  • LEDs
  • Transceivers
  • Cabinet and Rack Installation
  • Grounding the Switch
  • Installing and Removing Components
  • Connecting the IBM SAN48C-6 Switch
  • Technical Specifications

Specifications

Machine type/model (MTM)8977-T48
Port count and link speed48-port, 32 Gbps Fibre Channel
EMC classificationFCC Class A digital device
Cooling and power componentsRemovable fan modules and power supply units
Management connectionsConsole port and out-of-band Ethernet management port

Frequently asked questions

What is the IBM publication number of this switch guide?

The guide is IBM publication SC27-9572-00.

Which rack installations does the guide describe?

It covers installing the switch in a 4-post rack and in a 2-post rack, including shelf bracket kits for two-post Telco and four-post EIA racks.

What should be done with the switch before installing it?

The switch should be unpacked and inspected, and NEBS compliance is noted.

What FCC class does the switch meet?

The switch is covered by the FCC compliance information for Class A devices.

Download PDF (3.6 MB)

More IBM Manuals


View all IBM manuals →