IBM 1 Data Migrator for i User’s Guide Part 2 introduces IBM Db2 Web Query for i DataMigrator ETL Extension. The guide contains the following contents: Scheduling and e-mail, Using Change Data Capture (CDC), CDC for Local Journals, and CDC for Remote Journals.
This IBM DataMigrator for i User's Guide Part 2 is part of the IBM Db2 Web Query for i DataMigrator ETL Extension documentation dated June 2021. It explains how to schedule DataMigrator flows in the DMC and set up e-mail notification when a scheduled flow fails.
The guide also describes Change Data Capture (CDC), including journal-based reading, DB log and listening parameters, read limits, and CDC setup for local and remote journals. It includes procedures for creating bulk load flows and CDC maintenance flows.
Right-click the flow, choose Schedule and E-mail, then Manage, and set the Scheduling Status to Active.
Yes. In the scheduling screen, expand E-mail on failure, enable it, and enter the recipient address.
CDC cannot process minimized entry data, so minimize entry data should be set to *NONE.
No. CDC only processes transactions that have been committed.