Enshi Basin Faucet Installation Instructions

The Enshi basin faucet is made of high-quality brass material, with surface electroplating process, corrosion resistance, wear resistance and long service life. After unscrewing the nut group No. 15 of the faucet body, insert it from top to bottom into the middle hole of the three-hole basin, then install the gasket and the nut group No. 15 under the platform, and then tighten the hexagon socket head cap screws with the hexagon wrench.


Enshi Basin Faucet Installation Instructions - cover page
Brand
恩仕
Document type
Installation Guide
Language
Chinese
Pages
3
File format
PDF
File size
278 KB
Published
29 November, 2023
Updated
29 November, 2023
MD5 checksum
5E2ABE249178E6B88AB1B4A89914EC41

About this manual

These installation instructions describe how to mount an Enshi basin faucet on a three-hole basin. They list the tools needed, state the working pressure and water temperature limits, and warn that impurities inside the wall recesses must be cleaned out before installation.

The guide then walks through the steps in order: installing the main faucet body and the side handle bodies with their gaskets and nut sets, connecting the braided hoses (red to the left/hot side, blue to the right/cold side), checking that the angle valves work, connecting the hoses to the angle valves, and finally opening the valves to check for leaks and confirm that hot and cold water work. This manual is written in Chinese.

What's inside

  • 安装所需工具
  • 安装注意事项
  • 龙头安装说明
  • 检测角阀是否正常
  • 编织管接入角阀
  • 试水

Specifications

Working pressure0.1 to 1 MPa
Recommended working pressure0.1 to 0.6 MPa
Working environment temperature4 to 40 °C
Inlet water temperature4 to 90 °C

Frequently asked questions

What tools are needed to install the faucet?

A screwdriver, an adjustable wrench and an Allen (hex) key are needed.

What are the pressure and water temperature limits?

Working pressure is 0.1 to 1 MPa with 0.1 to 0.6 MPa recommended, ambient temperature 4 to 40 °C and inlet water temperature 4 to 90 °C.

Which hose connects to the hot water side?

The braided hose with the red label connects to the left side; the blue-labeled hose connects to the right side.

What must be done before installing the faucet?

Clean out impurities from the parts embedded in the wall, flush the pipes, and check that the angle valves open and close properly.

Download PDF (278 KB)