This document is a Start Up & Commissioning Manual for WiBAS OSDR-Hub and Terminal Station.
This edition 5.1 manual provides detailed instructions for starting up and commissioning the Intracom Telecom WiBAS OSDR Hub & Terminal Station and the WiBAS-Connect Terminal Station. It is intended for a wireless certified technician who performs installation inspection, coarse and fine antenna alignment, system commissioning with a laptop and telecom software, and service provisioning. Commissioning is performed through Node Manager, described as an embedded application.
The procedures cover prerequisites and required tools, powering through a DC or AC power injector, physical management connections, accessing a radio unit, and configuring operational parameters. They also cover antenna alignment, checking operation, and service provisioning. Appendices provide LED indications, inband management connection troubleshooting, and quality indicator thresholds.
| Default inband IP address | 10.10.10.100/24 |
|---|---|
| Default outband IP address | 192.168.1.100/24 |
| Fail-safe outband IP address | 192.168.255.254 |
| Commissioning application | Node Manager (embedded application) |
| CE marking | CE marked |
It covers the WiBAS OSDR-Hub & Terminal Station and the WiBAS-Connect Terminal Station.
Only a wireless certified technician with the listed installation, antenna alignment, system commissioning, and service provisioning skills.
Commissioning is performed through Node Manager, an embedded application.
The default outband IP address is 192.168.1.100/24.