This document describes the installation instructions for Norlake® Kold Locker™, Fast-Trak®, Fineline™, Enviro-Line & Mini Rooms and Master-Bilt® QS Series, Quick Ship, Bilt2Spec™ & Ready-Bilt™ walk-in coolers and freezers.
This manual covers installation of Refrigerated Solutions Group walk-in coolers and freezers, including Norlake and Master-Bilt series. It provides safety policy, required tools, unpacking and inspection, foam panel storage, construction diagrams, section latches, installation steps, electrical connections, maintenance, door parts, and a final installation checklist.
It also includes site selection, base preparation, wall and ceiling panel construction, panel installation order, door and ramp details, membrane roof information, wiring, and maintenance guidance for the walk-in.
| Indoor relative humidity | 30% - 60% |
|---|---|
| Indoor dew point | 50°F or less |
| Section latch locking turn | approximately 3/4 of a complete turn |
Contact RSG immediately.
Store them vertically on skids with spacers between panels, with the female rail edge down.
Relative humidity should be kept between 30% and 60%, with a dew point of 50°F or less.
Only if that floor has been specially prepared and adequately insulated for below-freezing storage temperatures.