This document describes the operation manual of the synthesis gas compressor system 3D emergency drill software.
This manual from Jiangnan University School of Chemical and Material Engineering describes operation of the synthesis gas compressor system 3D emergency drill software. It presents an emergency shutdown drill scenario following an abnormal sound and fire at synthesis gas compressor 103-J.
The documented steps include reporting to the squad leader, closing PIC6, closing inlet valves V01F104 and V02F104, opening PIC4 to depressurize 104-F, and retreating to a safe distance. This manual is written in Chinese.
Open the software and click the first level, "Emergency Shutdown."
Click the walkie-talkie button in the command bar and report to the squad leader.
Synthesis gas inlet valve V01F104 (raw material gas inlet).
Open pressure control valve PIC4 on the synthesis gas compressor DCS diagram.