UJVNL Asan Barrage Operation and Maintenance Manual

Operation and Maintenance Manual for Asan Barrage


UJVNL Asan Barrage Operation and Maintenance Manual - cover page
Brand
UJVNL
Category
Industrial Robot
Document type
User Manual
Language
English
Pages
213
File format
PDF
File size
8.2 MB
Published
17 November, 2023
Updated
17 November, 2023
MD5 checksum
E563935F5D427C562E56175B0B9A2B9A

About this manual

This Operation and Maintenance Manual for Asan Barrage was prepared by UJVN Limited in collaboration with the Dam Rehabilitation and Improvement Project (DRIP). It serves as an upgraded version of the existing manual, designed to organize and manage the operation, inspection, and maintenance of the barrage to reduce risk and optimize performance. The document is intended primarily for barrage operation staff and their supervisors, though it also includes instructions for other staff involved in the barrage's management.

What's inside

  • Preface
  • Team Involved in Preparing this O&M Manual
  • Approval and Implementation
  • Disclaimer
  • Position & Status monitoring
  • Main Control Panel
  • Local Control Panel

Specifications

CPU ModelSIEMENS 314C-2PN/DP 24DI/16DO/4AI/2AO
Communication ProcessorSIEMENS CP 340
HMI Size15 Inch
Gate Count22 Gates
Power Supply Input100-240V
Power Supply Output24VDC / 12.5A
MCB Rating (DP)10KA 32A
MCB Rating (SP)10KA 6A

Frequently asked questions

Who is responsible for preparing this manual?

The manual was prepared by UJVN Limited in collaboration with the Dam Rehabilitation and Improvement Project.

What is the primary purpose of this manual?

The manual is designed to organize and manage the Operation, Inspection and Maintenance of Asan Barrage to reduce its risk and optimize its performance.

What type of transducers are used for gate status monitoring?

Only absolute value type angular/ rotary/laser encoders decoders transducers shall be used to read the actual status of the gates.

Download PDF (8.2 MB)