This document describes the installation instructions for a vinyl gutter system.
Amerimax Contemporary Vinyl Gutter Systems installation instructions cover planning the roofline, locating downspouts, installing hooks, joiners, drop outlets, and assembling downspouts. They include measurements, spacing, and fastener sizes for the gutter components.
The document is bilingual, with English and Spanish instructions, and lists required tools plus a parts list for the system.
| Chalk line offset from fascia | 1/2 in (13 mm) |
|---|---|
| Gutter slope | 1/8 in (3 mm) per 10 ft (3 m) |
| Hook spacing | 18-24 in (46-61 cm) apart |
| Hook placement from end | 12 in (30 cm) |
| Minimum downspouts | 1 per 40 ft (12 m) of gutter |
| Gutter section length | 10 ft (3 m) |
| Downspout distance from wall | 1 in (26 mm) |
| Downspout end height | 6-12 in (30-60 cm) above ground |
| Hook fastener | #8 x 1-1/2 in (38 mm) screws |
| Downspout fastener | #8 x 1/2 in (13 mm) self-tapping screws |
Snap a chalk guide line starting at the high point, sloping down 1/8 inch (3 mm) for every 10 feet (3 m) to the downspout.
Use a minimum of one downspout per 40 feet (12 m) of gutter.
Eye protection, pencil, tape measure, string, level, hack saw, drill, and screwdriver.
Fasten hooks 12 inches (30 cm) from the end and 18 to 24 inches (46-61 cm) apart.