Hytrol SBC Belt Conveyor Installation and Maintenance Manual

This document is an installation, maintenance and operation manual for HYTROL Model SBC belt conveyor.


Hytrol SBC Belt Conveyor Installation and Maintenance Manual - cover page
Brand
HYTROL
Category
Industrial Robot
Document type
User Manual
Language
English
Pages
20
File format
PDF
File size
2.7 MB
Published
17 November, 2023
Updated
17 November, 2023
MD5 checksum
894CD6C63809180C1CF25769FC3B567A

About this manual

This document is the Installation and Maintenance Manual for the Hytrol SBC belt conveyor. It covers essential procedures from receiving and uncrating the equipment to setting up the conveyor system, including specific instructions for ceiling hanger installation and electrical equipment wiring. The manual emphasizes safety protocols for personnel and equipment operation.

What's inside

  • Introduction
  • Receiving and Uncrating
  • How to Order Replacement Parts
  • Safety Information
  • Installation
  • Conveyor Set-Up
  • Ceiling Hanger Installation
  • Operation
  • Maintenance
  • Troubleshooting

Frequently asked questions

What is the minimum vertical clearance required when a conveyor is installed above an exit passageway?

A minimum clearance of 6 ft. 8 in. (2.032 m) must be provided from the floor to the lowest part of the conveyor or guards.

What is the minimum distance a ceiling hanger rod must be from the inside channel?

The ceiling hanger rod needs to be a minimum of 3" from the inside channel.

Where is the drive located on the Model SBC conveyor?

The drive is located at the discharge end of the Model SBC.

Download PDF (2.7 MB)

More HYTROL Manuals


View all HYTROL manuals →