This document is an installation, maintenance and operation manual for HYTROL Model SBC belt conveyor.
This document is the Installation and Maintenance Manual for the Hytrol SBC belt conveyor. It covers essential procedures from receiving and uncrating the equipment to setting up the conveyor system, including specific instructions for ceiling hanger installation and electrical equipment wiring. The manual emphasizes safety protocols for personnel and equipment operation.
A minimum clearance of 6 ft. 8 in. (2.032 m) must be provided from the floor to the lowest part of the conveyor or guards.
The ceiling hanger rod needs to be a minimum of 3" from the inside channel.
The drive is located at the discharge end of the Model SBC.