This document introduces the content of Chapter 2 of the 2G-1 Design Manual, focusing on rainwater runoff retention and providing relevant information.
This chapter provides general information for stormwater detention practices, including definitions of pre-developed and developed conditions and factors that can increase storm runoff.
It also states Iowa DNR permit conditions, a 100-year design storm unless otherwise required, release-rate requirements, allowed detention volume methods, and limitations on downstream stormwater runoff.
The design storm is the rainfall event having a return frequency of 100 years, unless higher frequencies are required by the Department of Natural Resources or the Jurisdiction.
The modified rational method may be used for areas up to 5 acres; for larger areas, the Storage Indication or modified Puls method should be utilized.
The developer, subdivider, or applicant should construct stormwater detention facilities designed by a Professional Engineer licensed in the State of Iowa that meets the criteria of this section.