This manual describes the installation and operation of the photovoltaic inverter.
This manual provides instructions for the installation, commissioning, operation, and maintenance of Afore New Energy on-grid photovoltaic inverters. It covers safety precautions, system diagrams, and specific models including the HNS3000TL through HNS6000TL series.
| Ambient Temperature | -25°C ~ 60°C |
|---|---|
| Protection Rating | IP65 |
| Grid Voltage | 220/230Vac, 50/60Hz |
| Isolation Resistance | 10 kΩ |
All work on the inverter must be carried out by qualified electricians.
You must wait 5 minutes after disconnecting both DC and AC power supply.
PV and AC connections should be checked twice a year.