This product is a fully automatic small electric steam generator with high thermal efficiency, low energy consumption, low noise, recyclable and safe and reliable.
This user manual covers the CYK1 series of automatic electric steam generators made for full steam irons by Nantong Yongchun Energy-Saving Technology Co., Ltd. The four models are CYK1-2 (380V/3kW), CYK1-3 (380V/4.5kW), CYK1-4 (380V/6kW) and CYK1-5 (380V/7.5kW), all built from 304 stainless steel and fed from a 380V three-phase four-wire supply. Maximum output steam pressure is 0.4 MPa, and an overpressure safety valve opens automatically. The unit is intended for steam ironing in the textile and garment industry.
The manual describes the machine's structure (DC low-voltage automatic control, steam generation and steam-water separation, condensate recovery for the iron, water tank base and housing) and its performance features. It then explains the operating procedure, the need for softened or distilled water, the causes and effects of scale, answers to common operating faults, weekly descaling and daily maintenance, and includes the warranty card with the company's contact details. This manual is written in Chinese.
| Voltage | 380V/220V |
|---|---|
| Power | 3 kW, 4.5 kW, 6 kW (7.5 kW for CYK1-5) |
| Maximum output steam pressure | 0.4 MPa |
| Body material | 304 stainless steel |
| Power supply | 380V three-phase four-wire |
| Built-in water tank capacity | 0.05 m³ |
| Feed water pump power consumption | DC 12V, 15W |
| Preheat time to 0.4 MPa | 4 to 8 minutes |
| Operating time with a full tank | over 20 hours |
| Warranty | 1 year from purchase; heating tube 3 months |
Softened water or distilled water. Hard water forms scale on the heating tube and pipe walls, which reduces heat transfer, raises power consumption and can block pipes or burst the heating tube.
First check whether the water level electrode lead wire is loose, then check whether the electrode is scaled and affecting its conductivity. Tighten loose connections, clean the electrode, or add a quick descaler.
Once a week. Add the descaler in the prescribed order, boil for 3 hours, then discharge under pressure.
One year from the date of purchase, with the heating tube covered for three months. Damage from user modification, improper use or failure to treat the water is not covered.