This booklet provides the reader with a construction cost guideline for new construction and rehabilitation work based only on recent historic costs.
This Construction and Rehabilitation Cost Guide provides a construction cost guideline for new construction and rehabilitation work based on recent historic costs. Costs are shown in 2013 dollars, and the edition describes an approach to total calculated project costs through stages such as planning, project management, engineering and construction.
The booklet covers cost examples and ranges for barriers, bridge structure coating and deck resurfacing, structure construction, pavement rehabilitation, runaway facilities, noise attenuation, retaining walls, and signalization and lighting. It notes that many project components can vary throughout the Province and that, unless otherwise stated, property acquisition, planning and evaluation, surveys, supervision, traffic management, utilities and defaults are excluded.
The costs in the guide are shown in 2013 dollars.
It provides a construction cost guideline for new construction and rehabilitation work based only on recent historic costs.
Unless otherwise stated, it excludes property acquisition, planning and evaluation, surveys, supervision, traffic management, utilities and defaults.