This document provides guidelines for the siting, design, construction and management of farm dams.
This document serves as a comprehensive guide for landholders, farmers, and natural resource management workers regarding farm dams on the Eyre Peninsula. It addresses critical issues such as water scarcity, salinity, and the need for equitable water sharing, offering technical information to support the establishment and management of these water resources. The guide emphasizes that while it provides best practice principles, professional engineering advice is required for construction to ensure safety and structural integrity.
Development approval is required if the dam wall is higher than 3 metres above the natural surface of the ground or has a capacity greater than 5 Megalitres (ML).
No, cleaning out silt in accordance with EPNRMB policies does not require a permit, though native vegetation clearance applications may be needed.
Permits are required for modifications in the priority (southern EP) catchments only, but native vegetation clearance applications are required throughout the whole State.