Eyre Peninsula Natural Resources Management Board Farm Dams Best Practice Guidelines

This document provides guidelines for the siting, design, construction and management of farm dams.


Eyre Peninsula Natural Resources Management Board Farm Dams Best Practice Guidelines - cover page
Brand
Eyre Peninsula Natural Resources Management Board
Category
Other
Document type
Other
Language
English
Pages
110
File format
PDF
File size
9.7 MB
Published
15 November, 2023
Updated
15 November, 2023
MD5 checksum
44FD9154454E13787846C1E1678B8E76

About this manual

This document serves as a comprehensive guide for landholders, farmers, and natural resource management workers regarding farm dams on the Eyre Peninsula. It addresses critical issues such as water scarcity, salinity, and the need for equitable water sharing, offering technical information to support the establishment and management of these water resources. The guide emphasizes that while it provides best practice principles, professional engineering advice is required for construction to ensure safety and structural integrity.

What's inside

  • Introduction
  • Permits and approvals
  • Regional background
  • Siting
  • Design
  • Construction
  • Management
  • Key contact people
  • Glossary
  • References and further reading

Frequently asked questions

When is a development approval required for a new dam?

Development approval is required if the dam wall is higher than 3 metres above the natural surface of the ground or has a capacity greater than 5 Megalitres (ML).

Do I need a permit to clean out silt from a dam?

No, cleaning out silt in accordance with EPNRMB policies does not require a permit, though native vegetation clearance applications may be needed.

Are permits required for modifying existing dams in all regions?

Permits are required for modifications in the priority (southern EP) catchments only, but native vegetation clearance applications are required throughout the whole State.

Download PDF (9.7 MB)