This is the prospectus of GF Securities Co., Ltd. for the initial public offering of shares and listing on the創業板.
This document is the Guide to Connection of Supply (GCS), 7th Edition, published by HK Electric in December 2021. It helps customers and electrical contractors prepare electrical installations for receiving electricity supply from HK Electric.
The guide covers application procedures, protection and metering requirements, electrical installation design guidelines, electric vehicle charging facilities, inspection criteria, and advice on supply reliability and power quality.
It explains the application procedure, outlines interface requirements, elaborates technical requirements of HK Electric Supply Rules, and highlights important wiring installation interface requirements.
No, the GCS is for reference only and does not supersede any existing rules and regulations.
It is available on the HK Electric website or as a printed copy at the Customer Centre.