Daily maintenance manual for GR series painting robots of CMA Hime (Wuhu) Robot Technology Co., Ltd.
This is the daily maintenance manual (document number ZL-GR-002-V1, published January 2020) for the GR series painting robots of CMA Hime (Wuhu) Robot Technology Co., Ltd. It is intended for operators, maintenance staff and service technicians, and applies to all GR series painting robots sold by CMA.
The manual describes the required daily upkeep: the recommended operating environment, wearing and replacing protective suits, cleaning the robot body with emphasis on the wrist, spray gun and gun holder, and cleaning the control cabinet and teach pendant. It is one volume of a full manual set that also includes safety, explosion-proof use, remote assistance, IO communication, software programming and mechanical/electrical maintenance manuals. This manual is written in Chinese.
| Operating environment temperature | 0°C to 40°C |
|---|---|
| Operating environment humidity | 20–95HR, non-condensing |
| Installation base vibration | Less than 0.5g |
| Purge air pressure (explosion-proof body) | 6–8 bar |
| Purge air flow | 900–1100 L/min |
| Purge air cleanliness | Particles smaller than 5 μm |
| Filter cotton replacement interval | Every 500 hours (recommended) |
The base and upper-arm suits should be replaced monthly, the process-arm protection weekly, and the wrist suit daily, adjusted according to actual contamination.
Use a lint-free cloth with cleaning agent, but strong corrosive solvents such as acetone must not be used; apply vaseline afterwards.
No, never blow the inside of the control cabinet directly with compressed air, and the power must be cut off before cleaning the controller interior.
Cleaning and maintenance of the robot body is recommended once per day to keep the robot in good condition.