The Jetour X70M car dismantling manual introduces the dismantling process of the Jetour X70M car, which consists of two parts: preprocessing and dismantling.
This is the vehicle dismantling instruction manual for the Jetour X70M, issued in December 2019 by the R&D Center and Marketing Company of Chery Commercial Vehicle (Anhui) Co., Ltd. It is written for vehicle recycling and dismantling companies and describes how to dismantle, recycle and dispose of the vehicle safely and in an environmentally sound way, in line with standards such as GB 22128, HJ 348 and GB/T 19515 (ISO 22628).
The manual is divided into pretreatment and dismantling sections. The pretreatment section covers removal of the battery, remote key and tire pressure sensor batteries, airbags, seat headrests and other hazardous or liquid-containing parts, with location, materials, weight, fasteners, tools, step-by-step removal methods, recycling routes and safety warnings for each component. The dismantling section describes removal of recyclable parts such as bumpers, fenders and covers, and the document ends with items like the tool kit, tow hook, wheel bolt wrench and jack. This manual is written in Chinese.
| Applicable vehicle models | SQR6485F019, SQR6484F019 |
|---|---|
| Market launch year | 2019 |
| Length x width x height | 4755 x 1885 x 1710 mm |
| Wheelbase | 2745 mm |
| Curb weight | 1468 kg / 1481 kg |
| Transmission | MT |
| Fuel type | Gasoline |
| Fuel tank capacity | 57 L |
| Drive type | Front-wheel drive |
| Tire size (spare) | 235/60R18 (spare: T125/80R17) |
| Luggage compartment volume | 670 L |
It applies to the Jetour X70M launched in 2019, vehicle models SQR6485F019 and SQR6484F019. The manual states that pictures and descriptions marked with a model are only valid for that model, so the model must be confirmed before dismantling.
Open the hood, disconnect the negative cable first and then the positive cable, unscrew the nut, remove the hold-down plate and take out the battery. The battery weighs 15.8 kg and is secured with one nut.
The driver and passenger airbag assemblies must be safely detonated first; the driver airbag is then pried out of the steering wheel at the 3, 6 and 9 o'clock positions, and the passenger airbag is unbolted from the instrument panel crossbeam with two M6 bolts.
Protective clothing, protective shoes, goggles, gloves, ear muffs, a helmet and a face mask are required, and fire-fighting, first-aid and eye-washing supplies should be prepared in advance.