Hong Wei Technology Co., Ltd. is a professional manufacturer of various foam grouting machines and peripheral equipment. Our company is constantly researching, innovating and developing various foam grouting machines and peripheral equipment to provide the industry with newer and more practical equipment needs; we have professional technology and enthusiastic service to let you use it with confidence and ease.
This operation manual covers the HW-AP series PU foam injection (grouting) machine manufactured by Hongwei Tech. Co., Ltd. of Miaoli, Taiwan. It describes the machine's standard specifications, main components such as the mix head, metering pumps, material tanks, control box, solvent tank and feed pump, and the auxiliary equipment required, including an air compressor, refrigerated air dryer and water chiller.
The manual gives step-by-step operating instructions: precautions before and during injection, end-of-day procedures, methods for measuring and adjusting the two-component mixing ratio and output volume, basic PU injection knowledge, and troubleshooting for warning lights affecting injection, general alarms and injection operation faults. This manual is written in Chinese.
| Power | AC 3-phase 220V, 11KW |
|---|---|
| Material tank capacity | 230L |
| Output volume | 400–2000 g/s (HW-AP100), 200–1000 g/s (HW-AP50), 50–250 g/s (HW-AP08) |
| Air supply pressure | 6–7 kg/cm² |
| Material tank pressure | 2 kg/cm² or less |
| Material circulation pressure | 15 kg/cm² or less |
| Allowed material viscosity | 1500 cps or less |
ISO material crystallizes and hardens when exposed to moisture, blocking the lines, while POLYOL material deteriorates and loses quality.
It provides tank pressure, valve shaft switching during injection, mixing and automatic flushing power, and power for the feed pump.
Remove the mix cup and discs, set a 3-second injection time, dispense both liquids into separate measuring cups, weigh each liquid, and adjust the metering pump speed to reach the required ratio.
Fill the material tanks to about 80% and seal them, then run the agitator, pumps and mix head briefly every 3–5 days to keep the machine responsive.