Hobart Ground Power 120CU20 (Series 500391C) 120 kVA Generator Set Operation and Maintenance Manual

Operation and maintenance manual for Hobart Ground Power 120CU20 120 kVA generator set


Hobart Ground Power 120CU20 (Series 500391C) 120 kVA Generator Set Operation and Maintenance Manual - cover page
Brand
Hobart Ground Power
Category
Generator
Document type
User Manual
Language
English
Pages
200
File format
PDF
File size
19 MB
Published
15 November, 2023
Updated
15 November, 2023
MD5 checksum
3819FC261578396722FBE621D093206E

About this manual

This OM-2137 manual covers the Hobart Ground Power 120CU20 generator set, Series 500391C, rated 120 kVA, 3 phase, 115/200 Volt, 400 Hz. It is published by ITW GSE Group, Hobart Ground Power, Troy, Ohio, and includes an illustrated parts list.

The provided text contains the warranty terms (Data Sheet 165) and the safety warnings and cautions section, covering shock prevention, installation and grounding, output cables, service and maintenance precautions, fire and explosion prevention, toxic fume prevention, bodily injury prevention, and first aid procedures. The manual states that skilled, technically qualified personnel should always be employed for installation, servicing, and operation.

What's inside

  • Warranty
  • Safety Warnings and Cautions
  • Shock Prevention
  • Installation and Grounding of Electrically Powered Equipment
  • Output Cables and Terminals
  • Service and Maintenance
  • Fire and Explosion Prevention
  • Toxic Fume Prevention
  • Medical and First Aid Treatment
  • Equipment Precautionary Labels

Specifications

Rated power120 kVA
Phase3 Phase
Voltage115/200 Volt
Frequency400 Hz

Frequently asked questions

How long does the Hobart warranty on this generator set last?

The warranty expires 15 months after shipment by Hobart to the first user, or 12 months after installation, whichever occurs first.

Which components are not covered by the Hobart warranty?

Hobart does not warrant engines and engine components such as starters, alternators, regulators, and governors, nor cable retrieving devices; many of these are warranted directly by their manufacturers.

Who should install, service, and operate the 120CU20 generator set?

The manual states that skilled, technically qualified personnel should always be employed for installation, servicing, and operation of the product.

What should be done before inspecting or servicing the equipment?

Shut off all power at the disconnecting switch, line breaker, or by disconnecting the battery, and lock the switch open or remove line fuses so power cannot be turned on accidentally.

Download PDF (19 MB)