UNICON V800 Series Ball Valve Installation and Maintenance Manual

This document provides installation, operation, maintenance and parts information for the V800 Series Ball Valve.


UNICON V800 Series Ball Valve Installation and Maintenance Manual - cover page
Brand
UNICON
Category
Other products
Document type
User Manual
Language
English
Pages
15
File format
PDF
File size
629 KB
Published
11 November, 2023
Updated
11 November, 2023
MD5 checksum
920D014CF8892A081334E26F1536EAC5

About this manual

This manual provides installation, operation, maintenance instructions and parts information for the UNICON V800 Series Trunnion Mounted Ball Valve. The valve is a general purpose valve used for long-range natural gas, oil, petrochemical and other chemical industry pipeline systems, and is available in a range of designs, materials, sizes and pressure classes in conformance with ANSI, API and NACE specifications.

The manual explains the valve's principle of operation, pre-inspection and installation steps, operating limits, periodic maintenance, a troubleshooting table, and disassembly, storage, packing and transport guidance. It states that transport, installation, commissioning, maintenance or repair must only be performed by trained or instructed personnel.

What's inside

  • Introduction
  • Pre-Inspection
  • Installation
  • Operation
  • Maintenance
  • Trouble Shooting
  • Disassembly / Reassembly
  • Storage
  • Packing
  • Transport

Frequently asked questions

Can the V800 Series ball valve be used to regulate flow?

No. The valve is only intended to block or allow flow and should only be used in either the fully open or fully closed position, not for throttling.

How long can the valve stay in a semi-open position?

It should not stay in a semi-open or semi-closed state for more than two minutes.

What causes leakage from the packing box area?

Possible causes are loose gland bolts, uneven tightening of the gland bolts, or damage to the packing part; retighten the bolts evenly or replace the packing.

What should be done before retightening packing gland and flange bolts?

Reduce the line pressure to the atmospheric level before retightening the packing gland and flange bolts and nuts.