The product manual describes the installation, maintenance and troubleshooting of the air valve.
This manual provides instructions for the installation of air valves, including preparation of the pipeline, correct positioning at high points or slope changes, and the requirement to install a check valve upstream. It emphasizes vertical installation and the need for ventilation in valve wells. This manual is written in Chinese.
The air valve must be installed vertically with the pipe line pointing upwards to ensure proper usage effect.
Close the check valve and remove debris, clean the sealing surface, replace damaged seals, or replace the rubber aging parts and float ball as needed.