The Riken series riveting machine is a fifth-generation new riveting equipment developed based on the principle of cold rolling. This series of products has introduced Swiss technology and improved the mechanical structure, hydraulic system, electrical control and other aspects, so that the product's reliability, service life, energy saving and noise reduction are higher than similar domestic products. The equipment has compact structure, stable performance, convenient and safe operation. Compared with the traditional backward riveting process, it has the following obvious characteristics:
This is the version 1.2 operating instruction (使用说明书) for the Ruiken JM9TQ riveting machine, published by Wuhan Ruiken Automation Equipment Co., Ltd. It opens with a start-up and commissioning checklist covering unpacking, leveling the machine, the 380 V three-phase four-wire connection, filling the tank with No. 32 hydraulic oil, checking oil pump rotation direction, and setting the counter and pressure.
The manual then describes the machine's main features and uses, the power head and its 11-petal cycloidal riveting motion, the lifting worktable, the hydraulic and electrical systems, moving and installation, commissioning and operation, precautions, standard parts, riveting head design and troubleshooting. Later sections give step-by-step instructions for replacing the piston and cylinder seals, an inspection certificate with measured values, a warranty card, a packing list and daily maintenance notes. This manual is written in Chinese.
| Power supply | 380 V, three-phase four-wire connection (A/U, B/V, C/W to phases, E/N to neutral) |
|---|---|
| Hydraulic oil | About 200 liters of No. 32 hydraulic oil, filled to the middle of the temperature oil gauge |
| Spindle coaxiality to locating hole | 0.1 mm |
| Spindle perpendicularity to worktable | 0.2/100 mm |
| Initial pressure | 0.5 MPa |
| Noise | Less than 75 dB |
| Inspection standard | JB/T9966-1999 |
| Counter setting range | Maximum value 9999, multiplier ×1 |
It requires 380 V with a three-phase four-wire connection: A/U, B/V and C/W go to the three phases and E/N goes to the neutral line. The machine will not work if the neutral line is not connected.
Pour about 200 liters of No. 32 hydraulic oil in through the side hole of the oil tank, until the oil covers the middle of the temperature oil gauge.
With the foot switch pressed and held, open the pressure gauge switch and turn the overflow valve screw to adjust the pressure.
Normally after three to five years of use the seals show varying degrees of wear, and the manual recommends replacing them with the spare seals.
The company states that any of its products get one year of free full warranty and lifetime maintenance; misuse, force majeure, altered certificates, second-hand equipment and units past the warranty period are excluded.