French Fitness FFM-VLP/FFN-VLP Marin and Napa P/L Vertical Leg Press Assembly Manual

The FFM-VLP/FFN-VLP French Fitness Marin and Napa P/L Vertical Leg Press Assembly Manual provides detailed instructions on how to assemble and use the product.


French Fitness FFM-VLP/FFN-VLP Marin and Napa P/L Vertical Leg Press Assembly Manual - cover page
Brand
FRENCH FITNESS
Category
Other
Document type
Installation Guide
Language
English
Pages
9
File format
PDF
File size
809 KB
Published
07 November, 2023
Updated
07 November, 2023
MD5 checksum
10554034B758E0D071B56DBAB1051D93

About this manual

This is the assembly manual for the French Fitness FFM-VLP / FFN-VLP Marin and Napa P/L vertical leg press. It opens with a numbered parts list covering the individually packaged components (NO 1 to NO 8), followed by the assembly parts (NO 9 to NO 25), such as the Smith aluminum handle, right and left fuse assemblies, handle covers, positioning columns, guide rods, foot pads and pipe plugs.

The second half lists the standard screws and fasteners in the blister pack (items A to K, including M6, M8 and M10 hexagon socket flat head screws, M8 and M10 locknuts and flat gaskets) and then walks through four assembly steps with the item numbers, names and quantities needed for each. Each step names the tools required: a 6# inner hexagon screwdriver and a wrench. Notes state that the guide rod must be inserted from above after the trolley is put in place.

What's inside

  • Individual Packaging Parts List
  • Assembly Parts List
  • Blister Pack Screw List
  • Assembly Step 1: Handle and Guide Rod
  • Assembly Step 2: Frame and Cross-Support Connection
  • Assembly Step 3: Seat and Trolley
  • Assembly Step 4: Head Cushion and Back Pad
  • Tools and Equipment

Frequently asked questions

What tools are needed to assemble the vertical leg press?

Each assembly step lists a 6# inner hexagon screwdriver and a wrench as the tools and equipment required.

How many big rack assemblies come with the FFM-VLP/FFN-VLP?

The parts list shows two big rack assemblies and two horizontal support connection components.

When is the guide rod inserted?

The note states the guide rod must be inserted from above after the trolley is put in place.

Which fasteners are used in assembly step 2?

Step 2 uses M10*130 hexagon socket flat head screws with M10 flat gaskets and M10 lock nuts, 12 of each.

Download PDF (809 KB)