China-ASEAN Information Harbor Guijiantong Platform Assembly Building Usage Reporting Operation Manual

Assembly building is a building that is produced in the factory, transported to the site and assembled on site. This document introduces the process and operation method of reporting assembly building.


China-ASEAN Information Harbor Guijiantong Platform Assembly Building Usage Reporting Operation Manual - cover page
Brand
China-ASEAN Information Harbor
Category
Other software
Document type
User Manual
Language
Chinese
Pages
6
File format
PDF
File size
375 KB
Published
03 November, 2023
Updated
03 November, 2023
MD5 checksum
BD67F66C19D1DD321A2084F80D416325

About this manual

This operation manual from China-ASEAN Information Harbor Co., Ltd. explains how to report assembly building production capacity and project assembly rate usage through the Guijiantong platform (桂建通). It describes the background of the monthly reporting requirement, the platform entry address, and the steps for registering a project that has not yet been registered.

The manual then walks through the usage reporting workflow: selecting projects, checking and adding unit works, filling in progress, assembly rate and usage data, choosing the source production base, and submitting. It also covers viewing unit works in the unit work management menu and what to do when reported information is wrong or duplicated. This manual is written in Chinese.

What's inside

  • 背景说明
  • 入口
  • 项目信息注册
  • 项目使用情况上报
  • 选择来源厂家
  • 单位工程管理
  • 可能遇到的问题

Specifications

Platform entry addresshttp://gxjzgr.caihcloud.com/#/home/index
Project registration addresshttp://gxjzgr.caihcloud.com/Regulatory/admin/Regist/regist.jsp

Frequently asked questions

How many times can each project be reported per month?

Each project can be reported only once per month; repeated reporting is not allowed.

What should I do if the reported information is wrong or duplicated?

Contact customer service through the prompt icon on the right side of the Guijiantong homepage and provide the base or project account information and the reported data.

How do I exclude a completed unit work from the monthly submission?

Before submitting, change the unit work progress item to "no reporting needed" so that the unit work is not included in the submission.

Download PDF (375 KB)