CGU Public Works Audit Manual Part II Procedures

This is a manual on public works audit


CGU Public Works Audit Manual Part II Procedures - cover page
Brand
CGU
Category
Other
Document type
Other
Language
Portuguese
Pages
127
File format
PDF
File size
4.7 MB
Published
03 November, 2023
Updated
03 November, 2023
MD5 checksum
2E57FB3735B872D257625968E92C395E

About this manual

This is Part II of the Manual de Auditoria de Obras Públicas issued by the Ministério da Transparência e Controladoria-Geral da União, through its Secretaria Federal de Controle Interno. The manual is divided into a public Part I and a Part II reserved for use by the Sistema de Controle Interno do Poder Executivo Federal (SCIPEF); this volume contains the procedures.

The procedures are organized in two groups. The first covers general procedures applicable to any public work, separated by project phase: planning, bidding, contract execution and post-construction. The second gives procedures for verifying recurring, relevant failures associated with specific types of work, including sanitary sewer and distribution networks, civil works foundations, concrete structures, road and rail earthworks and paving, and railway works. The document is dated Brasília, agosto/2018. This manual is written in Portuguese.

What's inside

  • Procedimentos Gerais por Fase do Empreendimento
  • Planejamento
  • Licitação
  • Execução Contratual
  • Pós-Obra
  • Redes de Distribuição e de Esgotamento Sanitário
  • Obras Civis: Fundações
  • Obras Civis: Estruturas de Concreto
  • Obras Rodoferroviárias: Terraplenagem e Pavimentação
  • Obras Rodoferroviárias: Obras Ferroviárias

Frequently asked questions

How is the manual divided?

It is divided into two parts: Part I, which is public, and Part II, for the exclusive use of the federal internal control system (SCIPEF).

Who issues the manual?

It is issued by the Ministério da Transparência e Controladoria-Geral da União, through its Secretaria Federal de Controle Interno.

What does Part II contain?

Part II contains procedures applicable to public works audits, both general procedures and procedures by type of work.

When is this version dated?

The document is dated Brasília, agosto/2018.

Download PDF (4.7 MB)

More CGU Manuals


View all CGU manuals →