Fired Earth Natural Stone & Stone Mosaics Floor Tiling Installation Guide

This document describes the basic principles of installing your Fired Earth floor tiles.


Fired Earth Natural Stone & Stone Mosaics Floor Tiling Installation Guide - cover page
Brand
Fired Earth
Category
Other products
Document type
Installation Guide
Language
English
Pages
14
File format
PDF
File size
520 KB
Published
03 November, 2023
Updated
03 November, 2023
MD5 checksum
0A3FA86C408CD44F70B82A6F1E4C2420

About this manual

This Fired Earth booklet outlines the basic principles of installing Fired Earth natural stone and stone mosaic floor tiles, dated February 2017. It covers internal floor substrates and preparation, finished floor levels, under floor heating, hearths and fireplaces, planning the layout, grout joints, fixing, sealing, grouting, finishing, cleaning and maintenance, plus a section on external installation.

The guide also includes reference tables for substrate preparation, Pro 50 Levelling Compound coverage, adhesive coverage, sealants and finishes, and grout joint width and coverage. It refers readers to British Standard BS 5385 for more detailed technical information and lists showroom, technical and supplier contact numbers.

What's inside

  • Important Notes
  • Internal Floor Substrates & Preparation
  • Finished Floor Levels
  • Under Floor Heating
  • Hearths and Fireplaces
  • Planning
  • Grout joints
  • Natural Stone and Stone Mosaic Tiles Installation
  • Sealing & Enhancing the Colour
  • Grouting the Tiles

Specifications

Minimum tile distance from flames or main heat source300 mm
Maximum floor temperature during tiling over under floor heating15 °C
Pro 50 Levelling Compound maximum depth50 mm
Norcros standard set and fast-set S1 adhesive maximum bed depth10 mm
Grout joint sizes across the floor3 mm – 10 mm
Plywood overlay for suspended timber floors with vertical movement18 mm WBP plywood
Minimum drying time for new concrete floors6 weeks

Frequently asked questions

How long must new concrete floors dry before tiling?

New concrete floors must be allowed to dry for a minimum of 6 weeks, and if a screed is applied on top, a further 3 weeks minimum.

Can Fired Earth floor tiles be used over under floor heating?

The majority of Fired Earth floor tiles can be used over most under floor heating systems, but the tiles must be larger than 5x5 cm, including mosaic tesserae pieces.

What grout joint width is recommended?

Joint sizes may vary from 3mm to 10mm across the floor depending on the tile sizes and pattern; Roman and Milanese Mosaics are butt jointed except in showers, where a 3mm joint is recommended.

How far should tiles be kept from a fireplace or heat source?

Tiles should be kept a minimum of 300mm away from direct contact with flames or the main heat source.

Download PDF (520 KB)

More Fired Earth Manuals


View all Fired Earth manuals →