Seattle City Light Step-by-Step Customer Guide to the Online Application for Electric Service

This is a customer guide for the online electric service application process.


Seattle City Light Step-by-Step Customer Guide to the Online Application for Electric Service - cover page
Brand
Seattle City Light
Category
Other
Document type
Other
Language
English
Pages
48
File format
PDF
File size
1.6 MB
Published
02 November, 2023
Updated
02 November, 2023
MD5 checksum
46B7B288A4DFC024324AC2E124C4B71B

About this manual

Seattle City Light's Step-by-Step Customer Guide to the Online Application for Electric Service explains how customers apply for new or expanded electric service using a single web-based form. It covers the purpose of the online application, the information and attachments needed before starting, and where to call for help.

The guide then walks through each screen in order, from signing in and entering the service address through project information, scope of work, electric load detail, attachments, summary, legal acceptance and confirmation. It also describes the on-screen controls such as Save and Next, Previous, Edit, Print and Submit, and notes that incomplete applications are kept for 90 days.

What's inside

  • Introduction and purpose
  • Points of contact and acronyms
  • Getting started and customer checklist
  • Controls and interface overview
  • Service address and account number
  • Project information and participants
  • Scope of work and alteration of existing service
  • Attachments
  • Summary, edit and print
  • Legal acceptance and confirmation

Frequently asked questions

How long does Seattle City Light keep an incomplete application?

An incomplete application is stored for 90 days and is deleted if it is not submitted within that time.

Who do I contact for help with the online application?

Contact City Light Application Intake at (206) 233-APPS (206) 233-2777.

Is information on a partly completed screen saved?

No, information is only saved when the Save and Next button is selected.

What attachments does a new permanent service require?

Sample requirements include a site plan, load calculation, an electrical one-line riser diagram with service voltage and overall service amperage, building floor plans and a building elevation diagram, depending on the project type.