Hillstone HLB 120-240-52 AC/DC Load Bank Operating Manual

This document is the manual for HILLSTONE AC / DC LOAD BANK model HLB 120-240-52, which contains information about the product, safety precautions, connection instructions, operating instructions, specifications, rating table, maintenance instructions, fault finding instructions, etc.


Hillstone HLB 120-240-52 AC/DC Load Bank Operating Manual - cover page
Brand
Hillstone
Category
Test Set
Document type
User Manual
Language
English
Pages
6
File format
PDF
File size
116 KB
Published
31 October, 2023
Updated
31 October, 2023
MD5 checksum
9E254DF4D2F669744635C0D8ED9DC4DE

About this manual

The Hillstone HLB 120-240-52 is an AC/DC load bank designed for load testing of single-phase UPS equipment, gen-sets or battery discharge testing at currents up to 400 amps at a maximum of 130 V, or 200 A at a maximum of 260 V AC or DC, 78 KW. It has ten switched steps with a minimum switch step of approximately 1 A and is force cooled using mains-powered 230 V single-phase fans.

The operating manual covers safety considerations, connection procedure, operating instructions, specification, rating tables, maintenance procedures and fault finding procedures. It describes the dual-voltage feature, removable side-mounted terminal cover and interchangeable double-current link.

What's inside

  • Introduction
  • Safety Considerations
  • Connecting Procedure
  • Operating Instructions
  • Specification
  • Rating Tables
  • Maintenance Procedures
  • Fault Finding Procedures

Specifications

Maximum operating voltage130 V or 260 V AC or DC
Maximum load current400 A at 130 V AC or DC; 200 A at 260 V AC or DC
Shunt rating600 A DC (1 mV = 10 A)
Mains panel fuse rating5 A
TerminationInternally mounted, M12 stud termination
Size600 mm wide x 1000 mm long x 900 mm high
Weight121 kg

Frequently asked questions

What is the maximum load current at 130 V?

The maximum load current is 400 amps at 130 V AC or DC.

What auxiliary supply does the load bank require?

It requires a 230 V AC single-phase 50 Hz auxiliary supply.

When should the link be moved to position B?

For tests over 100 amps, the link should be moved to position B.

What should be done with the fans after a test?

Leave the fans running for a few minutes until the resistors have cooled.

Download PDF (116 KB)

More Hillstone Manuals


View all Hillstone manuals →